• Technical
  • Analysis Testing
  • Customized Syn
  • All Technical
  • logo
  • News
  • Company News
  • Business
  • Products
  • Construction Chemical
  • Water Treatment Chemical
  • Floor Solution
  • Flotation Chemical
  • Waterproof Material
  • Iron Oxide
  • Geosynthetics
  • Other
  • Download
  • Product Documents
  • PDF Files
  • Technical
  • Analysis Testing
  • Customized Syn
  • News

    News

    News
    Sirlanka Colombo Outer Circular Highway Northern SectionⅡ
    Sirlanka Colombo Outer Circular
    Sirlanka Colombo Outer Circular Highway Northern SectionⅡstarts from KERAWALAPITIYA refinery check post (-K0+672) and ends at KADAWATHA A1 road interworking bridge, with a total length of 9.32km. It is designed with two-way six-lane highway standards, road width of 33 meters, and speed of 100km/h.
    2016-08-30 09:07:15
    查看更多
  • Sirlanka Colombo Outer Circular Highway Northern SectionⅡ
     Sirlanka Colombo Outer Circular
    Sirlanka Colombo Outer Circular Highway Northern SectionⅡstarts from KERAWALAPITIYA refinery check post (-K0+672) and ends at KADAWATHA A1 road interworking bridge, with a total length of 9.32km. It is designed with two-way six-lane highway standards, road width of 33 meters, and speed of 100km/h.
    2016-08-30 09:07:15